terminals Checkdigitaloutputsquarequantityin% Repeat the test for Y-phase & B-phase & tabulate the results. Please click here to continue without javascript.. Commissioning Action Lists: Keeping Them Under Control, Part 1, Commissioning Action Lists: Keeping Them Under Control, Part 3. 5.1.4 Senior Technicians. 7.2.1.7 Verify that instrumentations and other electrical components are not damaged or broken (e.g. PLC Panel Check List Over all system cofiguration checks Pass Fail Comments System Name: Check Model, Quanity of the system modules against the record in BOM : Visual Inspection Checks Check the suitability of the testing area (staging area) Degree of Mechanical Protection The type test Certificate (as per IDS) including the electromagnetic FieldI/ONormal 66, 67, 68 & 75, Off Maruthamalai Road, Somayampalayam Village, Bharathiyar University P.O, Coimbatore - 641 046 (G +13 UPPER FLOORS) TECHNICAL SPECIFICATION VOLUME - III 6.7 Examples of Front Panel Configuration Sequence 117 6.8 Configuration Exercises for Typical Relays/Simulation Software 122 7 Cabling Commissioning and Periodic Testing 125 7.1 Review of Codes for Testing 125 7.2 Drum Length Checks 127 7.3 Post Installation Checking 128 7.4 Pre-commissioning and Periodic Tests 129 Panel. View full-text. Fixing screw shall enter into holes taped into an adequate thickness of metal or provided with bolts and nuts. Multidisciplinary consulting and engineering firm Follow. Performance & security by Cloudflare. CheckconfiguredAlarmsforHMI 9.2 Provide warning sign and sufficient barricade on working area and only assigned personnel will be allowed in the area. 3.3.23 SAIC-P-3852 LV Controlgear Reduced Voltage Motor Controller Pre-Commissioning. Your IP: Checkanaloginputsquarequantityin% Ready to use SOPs, Protocols, Master Plans, Manuals and more Worldwide Regulatory Updates Pharmaceutical News Updates Interview Questions and Answers All Guidelines in One Place. QAP- LT Panel.pdf. #CC: 000b. 1.4 LVMDP and LVSDP Electrical Panels. simulationpanel. Only assigned personnel shall be allowed in the area. This procedure is intended to provide general application guidance and establish controls during preparation and Testing. Ensure that the cables to the Switchgear are properly tagged & identified. 137.184.183.242 10.8 Attachment 8 SA-P-023 Automatic Transfer Switches. Download to read offline. 2. The erection includes placing the equipment on its foundation, completion of assembly, i.e. 7.2.2.12.6 Verify that all protective relays and analog meters have been tested and in proper operations by Secondary current injection. DoorsandLock/Keysarefittedsecurely ConfirmthatcorrectlamponthesimulationpanelturnsON. AllIOmodulesareincorrectRack/Slot Please don't spam. Aux. Meanwhile, the LVSDP (Low Voltage Sub Distribution Panel) electric panel has a function to distribute power to various other electronic devices. The following are some guidelines to ensure safety : Ensure that proper safety gear is used. 7.1.8 Pre-commissioning works are to be supervised by the equipment manufacturer specialists. Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page. priortopoweringup. Switchonpower,forallenclosuresObserveStatus 7.2.1.20 Close and trip breakers manually in the connected, test and disconnected positions. Ensure that all BMS wiring are completed. Allhazardouslabelsarefitted(voltage>50V) 7.2.2.2.1 High potential (Hi-pot) test conducted by 3 party SA approved laboratory technician only. Checkthetestcertificateasperdocument LVMDP (Low Voltage Main Distribution Panel) has a function to check the power from the transformer and then distribute it on the LVSDP panel. 3.4.1 Latest Approved for Construction Drawing. All Rights Reserved. This electrical commissioning checklist is used for the commissioning of low voltage installations in a building. Whenever work is dine on power circuits (LT or HT), all power sources must be isolated by opening and withdrawing the circuit breakers. DigitalInputs The outgoing feeders shall be energized one by one & the supplyshall be measured for current, voltage, phase & frequency. recordresults Checkterminalstripsfunctionalseparation All equipment calibration original certificates should be presented at site. INSPECTION CHECKLIST FOR LT. Checkanalogoutputsquarequantityin% Site Acceptance Tests are done at the specific places where commissioning is done. 7.1.3 Manpower, equipment, tools and other logistics shall be prepared and ready for installation. Locks with keys shall be available with tags as required by the LOTO procedures. Download a free Solar Panel Installation and Commissioning template to guide technicians through safe panel installation and operation. 6.0 TOOLS & EQUIPMENT AutomationForum.in, Allcabinetwiringshallbeinspectedpriortopowerup panel The action you just performed triggered the security solution. caleb isukuru. Choosing the right electrical protection devices for industrial control system, Types of Outdoor Circuit Breakers - Voltage Class, Installation, External Design, Types of Insulators - Overhead power line Insulator, Commissioning Procedures for Protection Relays On Site, Power transformer factory acceptance test checklist, Commissioning Procedure for HV / HT Cable, Types of Outdoor Circuit Breakers Voltage Class, Installation, External Design, Types of Insulators Overhead power line Insulator. INSTALLATION, TESTING AND COMMISSIONING OF DIESEL GENERATOR AND ALLIED WORKS IN CONSTRUCTION OF TICEL BIO PARK - III At SF No. 5.1.5 Technician. By visiting this website, certain cookies have already been set, which you may delete and block. 7.2.2.2.2 All Hi-Pot equipment shall be calibrated by approved calibration laboratory and documents will be submitted for conformation. 5.0 MANPOWER Performance & security by Cloudflare. The main function of the electric panel is as a source of distribution of electrical energy from the center to consumers. Verifyexistenceofcontrolprogram Be very clear and precise when giving instructions. 9.3 All electrical tools shall be checked and color-coded. 3.3.12 SA TR-P-3819 LV Controlgear Metal-Enclosed Equipment Pre Energized and Functional Testing. Standard operating procedure of operation and maintenance of low tension panels. outsideofthespecifiedlimit,adjustpowersupplyoutputinaccordancewith Inject the nominal secondary values step by step using secondaryinjection kit to the power scheme & tabulate the output valuesas per the rating of meters. AutomationForum.in, Check230VACavailableatterminal1&2 4.3 Lead Pre-Commissioning engineer (Third Party) is responsible for giving orders / instructions to the site execution team to perform all activities at site as per contract specification based on work schedule and ensure to accomplished works as per standards and respect schedule at all times, maintaining quality of works. Required fields are marked *. 9.8 Only those people directly involved in testing shall be within the barricaded area. 7.1.4 Prepare the workplace such as barricading the area and housekeeping. Randomlycheckthewiringforpropercrimpingandtermination(TugTest) There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. 7.2.2.11 Verify and ensure that all instrumentation display/ screen indicators are working properly (e.g. 3.3.6 SA Tl P-P-116-05 Switch racks and Distribution Racks. 4.2 The pre-commissioning works will be a combined effort of Third Party testing team, Field Operation Group (FOG), QC, Engineering and witnessed by Vendor representative and SA representative. Before starting any test, make a precise plan, including a circuit diagram for the test. Ensure that all the precommissioning checks are carried out successfully. For mechanical systems, pre-commissioning activities consist of cleaning and flushing of pipes, pressure testing, and leak testing. Note:AnydiscrepancywillbeinthepunchListandwillbeclearedbefore Check visually inspect the terminal 2. Always use multimeter for safety propose. PowerConnectionChecks 3.1.3 SAES-P-104 Wiring Methods and Materials. SystemPower(230VAC)Up, PLCPanelCheckList 9.1 Secure the approved work permit from the concerned Representative before starting any work. 3.3.5 SATIP-P-116-04 Low Voltage Control gear. COMMISSIONING CHECKLIST - 4. RedundancyChecks When working on unfamiliar equipment , read the operating manual carefully before starting the work. 185.23.118.97 9.11 Housekeeping shall be maintained and working area shall be kept clean and tidy in accordance with Site Housekeeping Procedure. Safety of testing and construction personnel should be the primary consideration at all times. Ensure that the installation meets all standards and requirements. Set communication with a unique address for each inverter. Eyeboltsfitted Ensure that the outgoing cables (power & control) from the MCC are terminated in the respective equipment / panels & properly tagged and identified. Annunciator Panel is a device that consists of a number of visible signals such as "flags" or lamps indicating the status of an alarm system or systems. 7.2.2.12.2 Where primary injection is impractical, utilize secondary injection with a minimum current of 1.0 ampere. Measure secondary voltage with the secondary wiring disconnected. TYPE (PCC, PMCC, MCC, PDB and MLDB) Test Date : Weather : Temp : TAG NO. 7 Safety Engineer shall be responsible in monitoring safety aspects and ensuring that the work is done in accordance with Saudi Aramco Construction Safety Manual (CSM). This website is using a security service to protect itself from online attacks. When working on any equipment,whenever possible ensure that control of the associated switchgear is local e.g. Randomlythesignalwiringshallbeinspectedpriortoloopchecksand Check for transport damages 4. Conduct tests to verify satisfactory performance of each control feature. 7.2.1.14 Inspect door handles, locking bars, and mechanism. 3.3.3 SATIP-P-116-02 Medium Voltage Control gear. Required Options. All test equipment required to be calibrated not more than 3 months before the date of test. Deploy your projects fast with a native integration and no-code/low-code customization. Alsocheckvoltageontheinputsideofthepowerdistribution Your email address will not be published. 7.2.1.17 Check draw out, racking mechanism for breaker freedom movement and properly lubricated. 3.3.24 SAIC-P-3853 LV Controlgear Feeder Contactor Pre Commissioning. Editable Pharmaceutical Documents in MS-Word Format. electrical_commissioning_checklist_non_leed. 4.6 QC Inspector shall be responsible for surveillance and inspection of the work and ensures that the work is performed and properly documented using applicable forms. This website is using a security service to protect itself from online attacks. 2023 Resco spol. The digital Swiss army knife for every field tech, An all-in-one solution for smarter field sales, Increase field team productivity, agility & customer satisfaction with mobile forms. Customer Support: +1907-317-4115 . Note:Earthbondingtestshallnotexceed0.1ohmsbetweenbondeditemand 5.13.3 Check incoming voltage between R-Y, Y-B and B-R on the volt meter provided, it should be 415 to 430 volts wherever applicable. Interrupter shall withstand the over-voltage applied without breakdown. Ramadan Naguib. 3.1.7 Schedule Q Saudi Aramco Project Quality Requirements. Check voltage levels at each point on terminal boards and at each terminal on devices. The next type of electrical panel is the Sub Distribution Panel (SDP). Tag all breakers and switches. All circuit breaker, disconnecting switch, interlocks operation must be completed once started. Cloudflare Ray ID: 7dfcea209d2134bb 7.1.7 Electrically Hazardous Task Plan / Permit shall be completed and signed before any work proceeds. AllMCBlabelsarefitted Click to reveal The CAL is developed and maintained by the commissioning professional separate from the punchlist and, like the punchlist, is tracked . 3.3.18 SAIC-P-3829 MV Controlgear Metal-Enclosed Equipment Installation and Pre-Commissioning. Yes / No Panel are performed safely, efficiently and in accordance with good working practice, as per Project Job Specifications. Download Now. 7.2.2.12.1 Perform current test by primary injection, where possible, with magnitudes such that ampere flows in the secondary circuit. checksheet. 5.4 Safety Engineer. (PCC, PMCC, MCC, PDB and MLDB) Weather : Temp : TAG NO. Ensure before use, that multimeter has been selected for the correct parameter and range and its lead are instead in the appropriate sockets on the meter. Its main function is to control the storage tank according to its water capacity. Such persons shall be capable of working safely and shall be knowledgeable on the precautionary techniques, personnel protective equipment, shielding and insulating materials and tools. Checkthemoduleconfigurationasper'RackAssignment&I/ODetails' Cabinetwiringvisualorcontinuitycheckedagainstdrawing, PLCPanelCheckList The electrical installer/contractor shall also carry out additional tests if called for in the project electrical specifications. 3.3.1 SATIP-P-111-01 Grounding and Bonding. Checkthecorrectsystemreferenceaddressisactivatedandthevalueinthe 10.10Attachment 10 SA-P-031 Low Voltage Power Circuit Breakers. Checkthecurrentatthefieldterminalsusingamultimeter. Paintworkfreefromscratches,blemishes,deformities Repeat the test for other phases as well. Yes / No 3 Position of busbars and spacing checked and found within acceptable limit. thecorrectionrequired. QAP- LT Panel.pdf. [ ] Completed After megger or high voltage test on nay equipment, be sure to discharge the equipment to earth after the test, This may be by connecting an insulated wire between the equipment and ground. It is expected at substantial completion that there will be some outstanding contractual obligations the contractor still needs to fulfill, and it's a standard practice for the contractor to prepare and submit a full list of items to be completed or corrected before final completion. MV SWITCHGEAR CIRCUIT BREAKER INSPECTION AND TEST PROCEDURE . Even if only one phase PT is being checked, it is necessary to isolate the other phases as well. 3.4.2 Vendor Drawing I Data Sheet. Please include what you were doing when this page came up and the Cloudflare Ray ID found at the bottom of this page. ), as well as operation handling instructions should be adhered. The most important pre-commissioning tests and in-service checks of protection system can be summarized as follows: Analysis of the wiring diagrams to confirm the polarity of connections, positive and negative-sequence rotation, etc. When commissioning and operating switchgear equipment under normal conditions, the general electrical safety instructions (gloves, insulating stool, etc. CalibrationTestCertificates 10.1 Attachment 1 JSA Job Safety Analysis. contact of the breaker using continuity tester, to conform the contact is in NO /NC. Verifythecorrectnessoftheconnectionwiththesupplysystem,correctpower [ ] Completed Record current date/time in Notes 6 Communication setting (if avail.) Ensureallcontrol 5.2 Vendor Representative (if needed). IR Test. As part of this project, start-up services will be performed on the electrical distribution and control equipment as specified. Ensure that the wiring termination to the Motor Control Center are complete & are tight & secure. ThetypetestCertificate(asperIDS)includingtheelectromagnetic It is easy enough to include language regarding the CAL but not so easy to change decades of the way things have always been done. 2. 7.2.1.21 Verify that all breaker of the same rating are inter-changed by racking each breaker in each cell of the proper rating. Overallsystemcofigurationchecks Pass Fail, PLCPanelCheckList 230VACInputfeedVoltage:Current: EnsureSystemHealthinessasbelow: Short the Y & B phase and connect to earth. Checka230VAC(+5%),50Hz(+1%)supplytoincomingUtilityACsupply 7.2.1.16 Check bus support & proper spacing. 1.2 About the installation and commissioning manual The installation and commissioning manual contains the following chapters: The chapter "Safety information" presents warning and note signs, which the user should pay attention to. Cloudflare Ray ID: 7dfce9b01b492189 3.0 APPLICABLE DOCUMENTS Build solutions for mobile workforces efficiently with our low-code/no-code platform. SS04 CH01 - 48V BDT Transducer SAT Format. intheFDS Ensure that the installation meets all standards and requirements. . Deploy mobile apps rapidly with 100% offline capability and native integrations. 7.2.1.4 General inspection of exterior of equipment. AllExteriorcabinetnamepltesarecorrectlylocatedandsquaredtofrontand You can email the site owner to let them know you were blocked. Activateeachoftheanaloginputsbyvaryingthepotentiometeronthe Switch ON the HV test kit control unit & apply the recommendedtest voltage (by increasing gradually) for 1 minute to R-phase withrespect to other phases earthed & grounded. Switch'ON'powersupplyandcheckvoltageontheiroutputterminals Ensure that no damage has occurred between mechanical completion& precommissioning. INSPECTION CHECKLIST FOR: INSTALLATION PANEL PRE-COMMISSIONING CHECKLIST The below checks are to be completed by the Controls Contractor prior to start up and commissioning . Ramadan Ali. this checklist has been designed to make it easier for inspectors to . themanufacturer'sguide. are'ON'suchasFanunit,PanelLampandFieldPSunits. 7.2.1.11 Verify that control wiring cables, wire markings are readable, correct and properly tagged. Allthedigitalinputsintoitsnormalposition'Open'or'Close'aspernormal 7.2.1.9 Check cleanliness of interior of cubicle and free from debris. These includes but not limited to the following: 7.1.1 Contractor shall appoint qualified employees as their competent persons. AllrackinterconnectI/Obuscablesarelabled The CAL is essentially a punchlist for invisible operational issues that cannot be seen during a punchlist walkthrough. usedforthetest) Check for proper potential at all device. Suggest new features & enhancements for Resco products. Check the circuit breakers on/off function. 1.1 Main Distribution Panel (MDP) 1.2 Sub Distribution Panel (SDP) 1.3 Synchronizing panel. PointtoGround(resistancetest) 3.3.15 SATR-P-3822 LV Controlgear Reduced Voltage Motor Controller Calibration, Setting, and Functional Testing. 7.2.1.10 Inspect insulation, standoff insulators, and bus separators for damage or clearance problem. UsingEngineeringstationforceON(energize)eachoutput That is where the commissioning action list (CAL) comes in for commissioned projects. 3.1.4 SAES-P-111 Grounding. Pre-commissioning check sheet for LV Switchgear, Commissioning check sheet for LV Switchgear. 3.3.13 SATR-P-3820 LV Controlgear Power Circuit Breaker Calibration, Setting, and Functional Testing. panel interface. CheckchangeoverbetweenPSA&PSBandviceversa Sorry, you have Javascript Disabled! checksheet. Checkdigitalinputsquarequantityin% Editable Pharmaceutical Documents in MS-Word Format. AnalogInputs In addition to below precise method of statement, you can find many electrical and ELV system testing and commissioning method statements from our web portal which you can also download as a package or one by one. Which generator will receive loads simultaneously and used as needed. of 1 FORM NO. Emergency Trip For this test the breaker has to be in charged or ON position, we operate the emergency push button. To ensure that Electrical Testing and Pre-commissioning of <1000V to 4.16kV Switchgear (SWGR) are performed safely, efficiently and in accordance with good working practice, as per Saudi Aramco Job Specifications. Allearthbarlabelsarefitted When ever temporary jumpers are required in testing, use jumpers of long length, so that even if you forget to remove them, they will get somebody elses attention. 1.1 To ensure that Electrical Testing and Pre-commissioning of Control, Distribution and Misc. In addition to the visible signal, an audible signal is usually associated with the device. Discharge the pole & also the HV test kit. Then then supply it to the next electric panel. 7.2.2.1 Perform insulation resistance test on each bus section, phase to phase and phase to phase ground for one (1) minute. Ensure that the earthing of the LV Switchgear has been completed. terminals DigitalOutputs And this is the inspection form for the electric panel that you should use for the checklist you need. Alldevicelabelsarefitted VisualInspectionChecks 7.1.6 Review all technical specifications, operating manuals and previous inspection data if appropriate. ensure that the motor controller has been disconnected and tagged out. 4.4 All test forms shall be prepared by the Testing Engineer (Third Party) and submitted QC for SA approval upon completion of each test. Tools and equipment should be in good condition for use in the construction area. and yet-to-be submitted closeout deliverables, such as O&M manuals, training, record drawings, etc. Whenever work is dine on power circuits (LT or HT), all power sources must be isolated by opening and withdrawing the circuit breakers. AutomationForum.in, Ferruletaggingvisualcheck,shouldbeclearandreadable October 2019. 7.2.1.19 Inspect breaker cell primary and secondary contacts alignment. 3.3.16 SATR-P-3823 LV Controlgear Feeder Contactor Calibration, Setting, and Functional Testing. He shall study all aspects of work procedure as per Saudi Aramco Standards. Do a phasing check at low voltage to ensure that voltage across the bus coupler breaker is zero when both transformers are energized. 3. Do not exceed maximum voltage stipulated for the test. Required Instruments & Tools Portable Hand tools Step Ladder Measuring instruments HV Test Kit Secondary injection kit Insulation resistance tester EthernetSwitchRedundancyCheck Distribution&GroundingDrawing) 3.3.14 SATR-P-3821 LV Controlgear Full Voltage Motor Controller Calibration, Setting, and Functional Testing. Check list for Installation and Commissioning of Control Panel 1. 9.10 TSTI meeting shall be conducted by Electrical Supervisor daily so that work activities will be properly coordinated to all concerned and all safety measures will be carried out on the entire work duration. LogicTest I recommend construction contract writers incorporate the commissioning action lists into a broader definition of the punchlist that needs to be fully closed-out before final completion can be declared and final payment made. 8.2 QC Inspector will be assigned to attend to the quality control and quality assurance requirement of this work. Erection Checklist for Solar Inverters, Solar Transformers & Solar String Com Electrical Maintenance for Engineers and Technicians, Pre-Commissioning Tests for AC Side of Solar Power Plant, Installation Operation & Maintenance of 33kV & 11kV Switchgear, Switchgear Installation Precomissioning Inspection.PPT, NFI - Industrial Automation Training Academy, Instrumentation Construction Pre- CommnEngineer RESUME. Treat CT secondary circuits with respect. Check for the location of installation is free of any water or constructiondebris. Commissioning is a method used to verify that a plant has been built, procured, manufactured, assembled, tested and ready for service in compliance with design sketches and requirements. 3.3.20 SAIC-P-3849 LV Controlgear Metal-Enclosed Equipment Installation and Pre-Commissioning. 1. 7.2.2.7 Verify that the Ammeter is accurately calibrated by current injection. To ensure that Electrical Testing and Pre-commissioning of <1000V to 4.16kV Switchgear (SWGR) are performed safely, efficiently and in accordance with good working practice, as per Saudi Aramco Job Specifications. 7.2.2.2.4 Testing shall comply with SAES-P-116 and all meters system calibrated before Hi-Pot test and calibration sticker will be visible. 5.3 For Drawing out the Breaker 5.3.1 Trip the circuit breaker, which is to be drawn out. Allanaloginputsintoitsnormalposition'lessthanHighsetpoint'or'more checkfusingandfuserating EnsurenoalarmontheIOmodulesafterpowerupofthe24VDCfieldpower Safework Method Of Statement. However, it is almost never mentioned in the project closeout requirements, either in the bid specifications or in the construction contract with the owner. Self-threading screws shall not be used in the construction of PCCs / MCCs / PDBs. Pre-built modules for your field solutions, A powerful way to digitize mobile workflows, Capture, standardize, and apply tribal knowledge. NO: DESCRIPTION: INSPECTION: INSPECTION HISTORY ACCEPTABLE: DATE: COMMENTS: Quality Control 1 ; FieldOutputPower(24VDC)Up Don't forget that safety and health at work are always the top priority, ELECTRICAL PANEL INSPECTION CHECKLIST FREE TEMPLATE. Technical Specification for Start-up and Commissioning of New Products Specification Number: 26 08 00.10 Product Name: Start-up and Commissioning of New Products PART 1: GENERAL 1.01 OVERVIEW 1. That is where the commissioning action list (CAL) comes in for commissioned projects. 1 drawings Approved drawing 2 Check that the proper supply mains is available near the panel & UPS Visual check 3 Verify the quantity of loop cards are as per the approved drawings Visual check 4 Verify that the power supply is as per the requirement Visual check 5 Any damaged part will be removed and the new part will be put in. 9.7 LOTO procedure shall be used while testing any live circuit. Get ready to use editable documents in MS-Word Format. Download Free Template A commissioning checklist is used to ensure the safety and functionality of new or modified systems in a facility. Spams/ Promotional links are not allowed and shall be deleted upon review. Allterminalblocklablesarefitted Rope off the area if necessary and erect warning signs. checkofthespaceoffutureexpansion 3.3.8 SATR-P-3802 Protection & Metering Meter I Recorder Calibration, Setting, and Functional Testing. Here we will review some brief explanations of the various types of electrical panels and their specifications: Main Distribution Panel (MDP) is a type of electrical panel that functions to divide and receive electricity supply from LVMDP. Thanks to The American Institute of Architects (AIA) and its contract templates for all things related to design and construction, there are industry standards for closing out a construction project. 8.3 QC Inspector shall be responsible to conduct all required inspection/ documentation and ensures that all applicable requirements, codes, and standards are complied with. This website requires certain cookies to work and uses other cookies to help you have the best experience. 3.3.11 SATR-P-3812 MV Controlgear Metal-Enclosed Equipment Pre Energized and Functional Testing. Omicron is . appicationcode. D04. Dec. 6, 2019 0 likes 11,537 views. There are several actions that could trigger this block including submitting a certain word or phrase, a SQL command or malformed data. Verifythecontrolandsignalcables 7.2.2.12.5 Perform phasing check on double-ended switchgear to ensure proper bus phasing from each source. Thismeansthesystemhaspowerbutithasno SpareCapacityChecks PANELS. De-energize load side connections. Commissioning Process - Step 4 - On-Site Commissioning. Final completion and, more importantly to the contractor, final payment is not due to the contractor until all items on the punchlist have been signed off as completed by the owner. Tracking open CAL items is time-consuming for the contractor; the commissioning professional; the building owner; and, even when design intent questions arise, for the design team at a time when everyone should be moving on to their next project. use this checklist to verify the compliance of the switchboard, main switch and circuit breaker, distribution board, and final circuits with client specifications. 3.3.4 SATIP-P-116-03 Low Voltage Switchgear and Switchboards. Perform secondary wiring integrity test. Performance & security by Cloudflare. Ensure that the LV Switchgear installation is complete & all mechanical & electrical comments on installation IRs are completed & approved. Allthechangesinthelogicshallbevisualizedbysimulatorpanel 3.3.19 SAIC-P-3830 MV Controlgear Power Circuit Breaker Pre Commissioning.. 10.4 Attachment 4 SA-P-010 Protective Relays. Trip circuit breaker by operation of each protective device.